Friday 27 February 2009

Day 13 - 15, 25 and 27.02.09

On Wednesday the concrete was poured and left to set on Thursday. It was a somewhat primitive procedure........This red contraption was used to hoist up 2 wheelbarrows at a time, filled with readymix concrete. Alan came by a few times on Thursday to wet the concrete.

This morning this little "apartment" was a beehive of activity, as the electrician was also here for a while with some of his men and I have noticed Alan had 4 men instead of the usual 3 on the job. By 2pm when they left, the front wall was up to window-height and they have also started with the side walls.

I will find out from Alan on Monday by when the shower-arm, etc. are needed.





Tuesday 24 February 2009

Day 12 - 24.02.09


Today was a scorcher - 9pm and it is still 28°.The electrician and his buddies continued with their work - on top of the deck it looks really "deurmekaar" - I only hope they know what they're doing. I wouldn't want to switch on the kitchen light only to find out it works the fan in the bathroom! In the downstairs picture you can see where the many lines have been grinded into the wall on the right - that is about above the counter and to the left of it. We now have the 2 light switches there and also the switch for the oven and a double plug. A bit busy, but I suppose it's ok.

The guy from the roofing company company was here.....

And tomorrow the concrete for the slab should come round about 10.



Monday 23 February 2009

Day 11 - 23.02.09

Oh boy, the noise and dust are just about killing us today. They are busy with the electrical points - with a few problems here and there! Anneliese has swept out the existing garage over the weekend, but today they have been drilling holes through there - I think to pick up the telephone point - so we can do the cleaning thing again.
Alan came to see me with another problem - the fridge is not to scale on the kitchen plan and doesn't fit in the way it is drawn. To fit in under the staircase, it has to move quite a bit forward. That way there is only ca. 200mm to pass through between fridge and counter. Obviously a no go. He (Alan) was a bit annoyed, because it meant we had to rethink where the light switches should go that we planned on putting on that wall next to the fridge, and that meant moving some pipes that were already in place for the electricity. I suppose there are always some structural problems, but I can understand that it is annoying that he cannot just work according to a plan. The heat today does not help to make the moods any better and all the dust from the grinding does not help either.....I'll bake a cake for them towards the end of the week or next week! Just from working in the garden for about an hour and a half, my hair is all grimy and hard from the dust! It gets in everywhere....

Thursday 19 February 2009

Day 9 - 19.02.09


Thursday started with a good shower of rain and I was holding thumbs that it wouldn't result in cancelling the slab. But at 08h15 Mariette of Quickslab phoned and said the guys are busy loading and should be here between 9h30 and 10h00. I thought she was being a little too optimistic with the traffic in this direction, but left it there. We still had a pile of rubbish to clear away before the slab came! I phoned Alan to inform him Quickslab is almost on it's way and where should they deliver? He was already on the phone to the "rubble-guy" who was supposed to collect the rubble on Wednesday night, but never turned up. All ended well - the slab only arrived at 11h00 and by that time the rubble had also been collected. So they have been busy hammering those slabs into place, filling the gaps in between with big cement bricks. Here are some photos - also from the street side as you requested.


Wednesday 18 February 2009

Wednesday 18 Feb

As you know, I fetched the plans yesterday from council and believe it of not - they didn't ask for any more money!! Alan has to fax off some forms, stating when building will start....He'll take care of it, saying we started on Friday and worked through the weekend if any questions are asked.
One cannot see much of what has been done the last 2 days, but the grinding seems to be time consuming. They have now patched up around all the window and door openings so that they are ready to build in the windows and doors. Then holes have been grinded into the existing garage wall (the inner wall) where the slab must be fitted into.
This afternoon I've been to sign the contract with Easylife kitchen. Alan thinks they can come and measure up in about a week/10 days. The plaster won't be done, but they say that is not a problem. They are able to deliver within 3 weeks after measuring up. They don't use subcontractors, so let's hope for the best. Two years guarantee. For the wardrobe I've chosen a finish that shows the woodgrain - should come to about R500 more on the quote, but in the end they kept the quote the same.
We have also collected a floor tile sample from Tile Africa - the one that we both decided we liked - and found a plain tile from CTM to use on the bathroom walls. Haven't bought anything, I just wanted to get some ideas. I also went to "On Tap" for a quote - they seem much cheaper than Bathroom Bizarre - even when quoting on Hans Grohe. Will have to see who we are going to use in the end.
Hopefully I can report on a bit more activity after tomorrow!

Monday 16 February 2009

Day 6 - 16.02.09


Monday - the garage door has been closed up to accommodate the double wood en glass doors like we have on the house. On the second picture you can see the winblocks that have been taken out, the window at the back of the kitchen is ready with a lintel for the new aluminium window, the kitchen window to the street still needs a lintel and the last one in the "lounge" must still be finished
I went to this glass and aluminium place in Killarney Gardens and also to the one where we have been next to Builder's Warehouse, to look at aluminium doors. I think that was a stupid idea of us. It means having a door with glass open to the street. Even though the glass is safety glass, you only need one bored kid to smash a brick into the glass and it needs to be replaced. And we have a car port over that door - rain shouldn't be a problem. I'm going to phone Alan now, hope it is not to late to change to a wooden door...If you don't feel the same way, please let me know immediately.
I can collect the plans tomorrow from council. Better remember to take money with, I suppose they would want their share again....

Thursday 12 February 2009

Day 4 - 12.02.09

Anneliese left for school at 07h10 and I very energetically started to wash the windows. I had barely finished, when loud noises were to be heard from the building site and a grey cloud of dust was everywhere....A lorry had arrived and the guys were busy loading all the rubble they had created yesterday. So much for my clean windows, but at least I hadn't put the washing out on the line yet! Immediately thereafter, the lorry from Brick and Clay arrived with the bricks. Alan tried yesterday morning in vain to phone them - in the end he drove there to order the bricks. Their telephone lines had been stolen! (The joys of living and building in SA!) Another problem yesterday was the taxi strike. At least all his guys made it to work on time, getting lifts, but he had to take them home. The strike still carries on, so I don't know if Alan had to pick up his people in Atlantis this morning. I just noticed that they had left the site before 5pm.
Today they took out the garage door and made a hole for the kitchen window facing the street and I think they also started with the openings where the slab has to fit in (will have to check that again). Then a guy called Frikkie from Atlantic Glass and Aluminium was here - he is in Killarney Gardens - I'll probably go there on Monday to look at windows and an aluminium door.

Day 3 - 11.02.2009



Day 3 was a full working day with lots of noise and dust. The ingeneur came to the site today to check on the necessity of this wall and beam that the planning department is so adament about. There is no need for either the wall or the beam - as far as carrying and construction is concerned. The wall is only there because we initially wanted that little storing room there. Alan and I discussed windows - we'll keep to winblocs for the front of the bedroom so that at least the gable look symmetric. Otherwise just similar aluminium windows for the kitchen and towards the road.
Unfortunately the plan does not correspond at all with the actual building. Michelle took pictures and then worked on the old plans and Patrick corrected the things that town planning was moaning about, but nobody actually checked if everything really corresponds. There is a big differance for example in the actual height of the gable/wall above our bedroom window, the roof is not shown correctly, etc. etc. Alan has to really measure out everything and change it on the plans accordingly. As he says, it is not really his job, but it quite often happens that people don't build according to the plan and then the plan of course never get changed afterwards.
Just to make us feel like it is not júst horrible things that we're doing, I've planted 3 of these "pig ears" - Cotlydon - in the 3 pots.

Tuesday 10 February 2009

Day 2 - 10.02.2009






Spot on at 07h45 Alan and only one of his guys arrived - to collect a ladder and a few other things. They'll be back later......



It's much later and all we can show for today, are a few photos that Anneliese and I took this morning. Tomorrow is another day, let's hope they'll show up....

At least we could have coffe in the "kitchen to be"!

Anneliese says "good bye" to the piano. Heuer will pick it up on Wednesday. Another chapter closed...

Day 1 - 09.02.2009




The big day has finally arrived - we have been waiting for over a month to start building. Though the actual building hasn't started, the demolishing has! Alan arrived with 3 guys at 8am and after taking down all the shelves, cupboards and the garage door motor, they started knocking out the windows and "winblocks" between the 2 garages. While one guy bricked the holes up, the others took down the roof of the garage. All this kept them going until 5pmJürgen, do you need this thingie hanging from the rafters??